ATP check. Problem with GR processing time

1966 Views

Hi All!

Please could you advise how to handle a following problem:

Current process of GR:

1. First the GR is posted for PO and PO is being closed.

2. The physical verification takes place and might take up to 2 days until all GR products are verified and placed to bins.

In ATP check, settings for Sales Order confirmation SAP looks into plant level. Thats Ok, until there is enough stock or purchase order with confirmations LA/AB. Then dates for confirming Sales order are taken from Purchase Orders confirmations. In these confirmations LA/AB GR processing time is taken into account (its setup as 2 days in master data) and dates when products are available on stock are calculated as delivery date + GR processing time.

Problem exists for a case when GR for Purchase order has been done and PO is closed but products are not verified (p.2 above) and at this point of time sales order is created.

Then during ATP check at plant level SAP sees that products are on stock and available, but this is not correct as still GR processing time (e.g. 2 days) are required for verification on consistency.

I'm searching for a way how to make GR for Pur. Ord so that receipted goods to be confirmed in the sales order as Date of Goods Receipt + GR processing time.

Thank you in advance