Hi Friends,
I want to fix a fixed lot size in the material master, during mrp run if my stocks levels falls below the reorder level then the systen will create a PR for the min lot size what i have mentioned.
Here my problem is For Ex:
If my Fixed lot size qty is 50. and my Demand mgmt for that material is 500, then durig MRP run the system will create a 10 PR's for 50 unit each, which i dont want !
I want only one PR at this point instead of 10 PR's.
Pl suggest me the steps.