Skip to Content
author's profile photo Former Member
Former Member

is it poss to no cons. rev. ongoodsentfor repair and repair cost charged

Is it poss. to achive the target that when ever any material requires repair then there is no reversal of consumption already booked wrt that material plus whenever such item comes after repair then only repair cost is charged to that particular material whenever it is issued for re-consumption.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2009 at 10:16 AM

    Hello

    just thought,

    you can create a separate service PO as repairs.

    2) if the stocks are maintained for the goods, then you can create subcontracting PO for repairs

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 19, 2009 at 10:22 AM

    ADD TO ABOVE

    IS IT NECESSARY TO HAVE THIS MATERIAL AS NON VALUATED OR WE CAN ACHIVE THE TARGET KEEPING MATERIAL AS VALUATED ONLY

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 25, 2009 at 06:53 AM

    over

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.