I'm working on integrating HCM with IDM. I came across the following limitations in one of the documents i happened to glance.
1. When replicating the data to the Identity Center from SAP HCM over the Virtual
Directory Server, you can only use scheduled synchronization. You can not
synchronize the data based on events. This is a limitation of SAP HCM.
2. The delta mechanism is not pre-configured when importing the data from the SAP
HCM system into the staging area in the Identity Center. A full load is always
performed.
Can someone suggest me ways to achieve this integration. Is there are document available?