OAYC changing the dates

Former Member
0 Kudos

Dear experts

i have maintained the date 2007/004 , now i have to change the date as 2008/012

If i go to OAYC system will showing grey only .

pls tell me how can i change the dates

regards

venkataswamy

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

When you have done depreciation runs after the asset take over you can't change it. Other wise the depreciation calcultation from the existings assets can be going wrong.

Have a look to to the asset take over data, there is a link between these 2

When you are in a development system you can reset/delete (TC OABL) the asset then you can change the values in the table. Do this never in a production system and when there are asset in that company code in production never transport the settings from OAYC to there

Former Member
0 Kudos

Thanks for your early response

My problem is solved

former_member221515
Active Contributor
0 Kudos

I went to OAYC for posting depreciation in 2007 (In IDES & Company Code: 1000)

But the year field is greyed out.

How to enter the date.