cancel
Showing results for 
Search instead for 
Did you mean: 

How to have make to stock strategy for configurable items

Former Member
0 Kudos

Dear Frndz,

My client would like to have make to stock strategy for their configurable items, pls help me out with the step by step procedure of the same.

Regards,

Srini

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

K-Mat Creation steps

1) Create Char in CT04 with assignment of Control indicators and Char values

2) Create Class in CL02 with type 300 and assign the Char to it

3) Assign this class to Material in Classification view in MM02

4) Create Configuration Profile in CU41 and Main Profiles for PP & SD relevancy

5) Assign Constraints and Procedures to Each Profile as per the rules required by design or Business

6) Create a Configurable Material (Mat type - KMAT) with Classification,Sales,MRP,Accounting views and Planning stg 25

7) Create A Super BOM(for K-mat) and assign all the comp with Proper Selection & Pre conditions

8)Create Super Routing(For K-mat) and Assign all operations with Proper Selection

Material Variant(MV) Creation Steps(Material variants are the stockable items in VC Scenario)

1) Create a MV with Material type FERT and Stg 10 or 40 (Classification view not essential)

2) Assign the K-mat material to this MV in Basic data - 2 view in Cross Plant CM field and click on Configure variant tab to select the fixed char value combination for this MV. Do the same steps in MRP-III view

By this way u can make the stock of configure items

Regards

Brahmaji

Former Member
0 Kudos

Dear Brahmaji,

I followed your way,but the system is creating the planned order without the BOM selection(exception message 52), so am not able to convert the planned order into production order.Pls help me out.

REgards,

Srini

Former Member
0 Kudos

hi

In CS40 create link configurable material and then try .

Regards

Avinash

Former Member
0 Kudos

Thank u avinash,

Also pls help me to link with the task list .I will award u full points.

Regards,

Srini

Former Member
0 Kudos

hi

There is no separate link to the task list when u assign material to configurable material in CS40 from that only it picks the link for example u create task list for same material. u just create super routing as per ur procedure it works.

Regards

Avinash

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

PLS try this procedure...

1) Take the material type as (KMAT)configurable material or check the configurable materials in Basic Data2 view..

2)Maintain the classificationv iew.

3)Then create the characterstics(CT04) and assign it to class(CL02) with a class type 300.

4)Then assign an object type to the characterstics..

5)Create a configuration Profile for the material(CU41).

.

Regards,

Sravanthi

Edited by: Sravanthi683 on May 13, 2009 8:01 AM

Former Member
0 Kudos

Check building block No. 147 in below link...

http://help.sap.com/bp_bl603/BBLibrary/Content_Library_BL_EN_IN.htm

Regards