Iu2019ve a material M1 at plant P1 with procurement type X. There is no SNP PDS/PPM for this material/plant. If there is a demand of 100 on this material/location and I run heuristics, it creates a planned order even though there is a transportation lane between vendor V1 and location P1. Why would it not create a Purchase Req in this case?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Please check if as per the lead time defined the transpaortation lane the demand is met on time. Yes as per the rule it should first check for external procurement and then generate planned order if demand is not getting fulfilled on time.

Thanks,

Sanjog

Answers (4)

Answers (4)

Former Member
0 Kudos

I checked the T-Lane and there was an issue with it since I'd created it manually. It now works as expected.

nitin_thatte
Contributor
0 Kudos

system switches over to external procurement in place of in house production only when you use optimizer.

Heuristic will do this only if there is a SNP PPM/PDS and the resource calendar prevents timely production.

Regards

Nitin Thatte

Former Member
0 Kudos

Hi,

Check whether quota is defined for the material at location P1. Check the planning logs created from where the source of supply is received. Also check whether PPDS PPM available for material M1.

Regards

R. Senthil Mareeswaran.

Former Member
0 Kudos

Does material M1 at vendor V1 exist and is it attached to the model?

Is the validity range of the procurement record in the tlane effective?