Dear all,
We are using SAP R/3 ->4.7. We carryout inspeciton with lot origin 01. My user wants the following condition in the system.
1) when the inspection lot is created , user will entry the results for the characterisitic and if the sample for one character is rejected then system should automatically propose for the second sample.
I heard that this facility is availble in SAP . Can experts guide me how to achieve my requirement using dependent multiple and independent multiple samples.
Regards,
M.M