cancel
Showing results for 
Search instead for 
Did you mean: 

Adding a new Dimension Cost center of entity type in Cost Center Reporting

Former Member
0 Kudos

Hi

I have created a application Cost Center of reporting type and i have also created a dimension Cost Center of entity Type with reference dimension Input Currency.

In the new Cost center Applicationi have already the Dimension Account, Category Entity, Data Src, Time & Input Currency. Now when in the Modify application tab (For Cost center Application) i am removing the existing Entity and assigning the newly created Cost Center Dimension and checking on the Modify Dimension Tab on the Action Pane, it is showing an error of

"THE FOLLOWING ENTITY DIMENSION ARE SET AS A LOCK DIMENSION

"THE ENTIRTY DIMENSION ARE SET AS A CONCURRENT LOCK DIMENSION

Can any one help me to resolve this issue please

Rgerdas

krish

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks for the reply

Regards

krish

Former Member
0 Kudos

Before you remove the Entity dimension, you must first un-assign it as either a work status dimension or a concurrent lock dimension. YOu'll need to temporarily assign some other dimension as the locking dimension.

Once you replace Entity with CostCenter, you'll probably want to set back the locks to use the new CostCenter dimension.