Skip to Content

QM_Dynamic modification rule

Dear QM Experts,

Scenario and Requirement

1. There are few incoming materials for which every inspection lot has to be skipped.

2. This control is required for specific vendor material combination wise.

3. Elaborately this may possible that for material 123000 there are 2 vendors ABC and XYZ. Out of which all inspection lots those come from ABC only have to be skipped while for XYZ vendor inspection lots should be created in REL mode.

Queries

1. Can we fulfill this requirement by DMR at lot creation?

2. Since there are no parameters that client want to inspect should we use DMR without task list?

3. First inspection lot should be skipped. Whether it is must to create quality levels manually for the first time?

4. Can anybody brief the step by procedure to fulfill this requirement?

Thanking you

Best Regards,

Anand Rao

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    avatar image
    Former Member
    May 05, 2009 at 11:29 PM

    HI Anand,

    If you don't want to do inspection for particular material vendor combination then Just go to quality info record & select the option "No Inspection" in "Insp. Control" Tab. No inspection lot will be created for this vendor material combination for GR's. I think you no need to do any DMR for this issue. Let me know if it works for you.

    Regards,

    Audi.

    Add comment
    10|10000 characters needed characters exceeded

    • You can map this process through other possibility also, but as per me this is best option. We used same option at 1 of our client location.

      Our scenario is business don't want to do any inspection just they want to map final decision in system and after accepted decision they want to SKIP UD also for some time. In this case we have mapped same process what I have suggested you. We used blank inspection plan with SKIP DMR rule.

      I hope it would help you.

      Thanks!!!

  • May 05, 2009 at 02:16 PM

    Here I would suugest created DMR rule and assign to inspection plan accordingly.

    If sane material you want to SKIP for vendor ABC and want to inspection for XYZ then create two diff inspection plan and assign DMR rule to Inspection plan of Material which you have created for vendor ABC.

    1. Can we fulfill this requirement by DMR at lot creation?

    Yes, here DMR is best option to fulfill this req.

    2. Since there are no parameters that client want to inspect should we use DMR without task list?

    If there is no parameter to inspection then create inspection plan as blank data, here no need to assign assign MIC, so system will create inspection plan just you need to do UD.

    3. First inspection lot should be skipped. Whether it is must to create quality levels manually for the first time?

    System will create quality level automatically once system will create inspection lot.

    4. Can anybody brief the step by procedure to fulfill this requirement?

    Here create diff inspection plan for material vendor combination and assign DMR rule accordingly. If you don't want to maintain any parameter in inspection plan then system will create lot just you need to do UD.

    Let me know your question or confusion. I will try to address it. I hope it would help you.

    Thanks!!!

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    May 05, 2009 at 02:18 PM

    Hi

    This is very much possible by DMR.

    1.Create a DMR(Steps Given Below)

    Now Lets consider material 123000 there are 2 vendors ABC and XYZ

    For Vendor ABC you can create a task list where in Material Assignment you can mension ABC vendor agaist material and Maintain a DMR(at lot level in Header of inspection Plan) which is Alwaz skip.

    For Vendor XYZ you can create a task list where in Material Assignment you can mension XYZ vendor agaist material and do not maintain DMR.

    Now look at the steps:

    1.Go to QDR1

    2.Click on At lot level.

    3.Go to Next screen

    4.Say stage 10 , click on skip ,short text:Skip

    5.Next line say 20,Enter seviarity say 4 ,click on seviearity ,Enter short text as say reject

    6.select bot lines and click on stage change

    No. of skips........999( you can change also)

    New insp. stage :10

    Rejections 1

    New insp. stage:20

    for stage 20:

    No. of Inspection : 1

    New insp. stage :10

    Rejections 1

    New insp. stage:20

    SAVE

    Apply this DMR to Inspection plan with vendor ABC

    His lots will be alwz skip while do not apply any DMR to XYZ his lots will be under inspection alwz.

    You need not to change Quality level manually

    I hope this will help

    Sujit S Gujar

    Add comment
    10|10000 characters needed characters exceeded

  • Jul 08, 2009 at 06:31 AM

    The requirement has been fulfilled by using DMR at material master level. Since the material-vendor wise control was not required later. This rule is applicable to all the materials irrespective of vendor-material combination wise control.

    Add comment
    10|10000 characters needed characters exceeded