Skip to Content
avatar image
Former Member

Availabity check fundamental

when ever we are using the avaliablity check , system checks for the availabe quantity .

suppose i have 2 line items with the same material.

the availabe quantity is 20 and i eneterd first line item as 15 and second line item as 10, what will happen.

for the first item it shows availabe quantity as 20 and for second also it shows avaible as 20 is it so?

Thank you for all the reply

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    May 04, 2009 at 06:31 AM

    Hi,

    Availability is checked based on order quantity. So in your order the total order quanity of the material is 25, and available is 20 then the confirmer quantity will consolidated as 20 ( if partial delivery is allowed) if not then next schdeule line will generate.

    For more details visit

    http://help.sap.com/saphelp_crm40/helpdata/en/e3/1e053883ccbc3ae10000009b38f8cf/content.htm

    Thanks,

    Raja

    Add comment
    10|10000 characters needed characters exceeded

  • May 04, 2009 at 07:07 AM
    for the first item it shows availabe quantity as 20 and 
       for second also it shows avaible as 20

    Yes system will confirm for all line items if you create a same material with multiple line items. This is because, system will consider the available stock, only if you include the quantity in the same line item.

    Each line item will be considered as a new requirement and that is why for the same material code, stock is confirming.

    thanks

    G. Lakshmipathi

    Add comment
    10|10000 characters needed characters exceeded

    • Yes as I said earlier, if you create multiple line items for the same material code, system will confirm for all line items. Based on this, you can create delivery but only to the extent of available stock, you can post the goods issue.

      thanks

      G. Lakshmipathi

  • avatar image
    Former Member
    May 04, 2009 at 07:32 AM

    SD Beginner ,

    Availability check is used to check the availability of the material and confirm the goods on customer requested delivery date. If the stock does not match with the customer requirement then system provides and gives an alternative day on which material is available.

    Suppose a customer ABCD has ordered for material M1 for 10 Pieces and requested it to be delivered on 07-05-2009. Based on the stock availability (which we check using MMBE) the stock will be assigned to the order.

    Say we have stock of 7. Then the system will assign 7 or confirm 7 pieces to the order and for the rest 3 it will give an alternative date based on the material avialability. Only 7 will be confirmed and delivery date for the 7 will be set.

    suppose i have 2 line items with the same material.

    the availabe quantity is 20 and i eneterd first line item as 15 and second line item as 10, what will happen.

    for the first item it shows availabe quantity as 20 and for second also it shows avaible as 20 is it so?

    1. System will confirm the first line item with 15 items

    2. System will confirm only 5 items for the second line item, and it will give an alternative day of confirmation for the remaining five items.

    "how can we confirm without stock"

    We maintain certain datas in Material MAster MRP2 - Gr Processing time , Planned delivery time all these will be considered and an alternative confimation date will be provided to the customer.

    you will have to configure the process and check. Strategy types (MTS, MTO...)play a vital part ... so seek PP consultant's help in this process

    Regards

    Sathya

    Edited by: Sathya Pavan Yedavalli venkata on May 4, 2009 9:32 AM

    Add comment
    10|10000 characters needed characters exceeded