Dear Experts,

I made PO with 100 qtty.

This Qtty 100 is transferred to Subcontractor(SC) using mvt type 541. SC consumed qtty 80 only. GR is made with this 80 Qtty and movement type 101.

So MBLB shows 20 qtty with that subcontractor.

How to transfer this 20 qtty to warehouse with reference to PO or GR?

Rgds,

Prasanna A P

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

If you have enabled PO filed in movement type field selection (t.code OMJJ) then you can refer PO and transfer material using 542 movement type.

Regards