on 04-30-2009 12:49 PM
Dear all,
I have a material which has a BASE UOM: EA
Product UOM: KG
82 KG = 1 EA
I create a routing and inside of it I put the BASE Operation UOM: 1000 KG
Shouldn't the system automatically know the relation there?
I open the operation line details and find in the Standard Values
Base Quantity: 1,000
Act/Operation UOM: KG
Unit of Measure Conversion
1 EA <=> 1 KG
How can this be fixed?
Hi,
Maintained the relation ship between KG and EA in Material master change mode
click on Additional data tab--> click on Unit of measure, where you cam maintain the relationship
Thanks
sreeni
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Rafik,
Although you have maintained the relationship in the material master, it won't get copied over here.
The unit mentioned here is operation UOM. And has independent identity.
You need to maintain the relation here too.
May I know the reason why you want UOM other than the base UOM?
And even if the special requirement then you can think & use the user exit available. Not so sure about it but you can give a try.
User exits available are
CMDI001
CPAU0001
CPDO0001
CPRE0001
XCZD0004
Take help of your ABAP guy.
Hope this helps you.
SmanS
Edited by: SAP PP Consultant on Apr 30, 2009 5:10 PM
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.