Skip to Content
0
Former Member
Apr 29, 2009 at 10:02 AM

Inspection lot not generated via CO07

38 Views

Hi QM Gurus,

Does anyone know how we can generate inspection lot via CO07 (production order without material number)?

I have done the steps below:

Customized inspection type 03 in order type PP03 (OPL8).

Created Reference Operation Sets 50000008.

Created Inspection plan for ROS 50000008 and assign IMC in the operation.

OSS note 675643

Anything I missed?

Any help would be appreciated.

Cheers,

Sun