I am not able to calculate material overhead after running Overhead calculation KGI2 Its not update in the production order cost analysis view.
I have thoroughly checked the cost sheet, overhead base, rate, credit, percentage, etc..
My plan and target cost overhead on material is coming as per the cost sheet.. but actual overhead on material alone is not coming..
How to do this, After calculating the Actual OH from ( KGI2) does it appear in the order?
Could some one help me out.
Kesh