hi experts
i am using
SAP Version: ECC 6.0 SR3
Database Version: 10.2.0.4
OS Version: HP-UX B.11.31
i have a server where O/S installed. i want to make this as a disaster Recovery server.
now i want to know.
1- what is the man power needed.?
2 -which technical guys i needed.?
3-how much time it will take?
4- can a basis consultant only do this job?
5-Is any separate team for DR server installation.
kindly guide me in detail regarding this.
thanks