Hi all:
We work with SAP ECC 6.0 (EHP2). So far we have not defined operating concern and therefore there is no assignment of controlling area to operating concern. Now the first time one of our sister concern wants to use CO-PA and therefore wants to define operating concern. We know the operating concern should be defined once and should not change or remove once it's created and is assigned a controlling area to it.
Our main concern is, if our other sister concerns want to use CO-PA in future with different data structure (Characteristics and value fields), than how can we tackle this problem?
Do we need to remove the existing operating concern and create new Operating Concern with new data structure or we can change and extend the existing operating structure?
Or is there any other solution for our problem?
Thanks and regards
SIM