PM Integration with PS

Hi,

Pls provide info reg PM-PS integration. What are the config steps to do?

As per client requirement i've to map this scenario in SAP & show the demo

at the earliest.

Pls provide your valuable solutions.

Thanks

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Apr 27, 2009 at 08:48 AM

    Hi,

    PM/PS Integration will be there,if you are doing any shutdown or maintanance.

    whatever you are incurring the cost in PM , you can capture in PS.

    Check the order creation - IW32 on additional Tab wherein you can assign the WBS Element. This will control even the Budget of the project.

    You can assign the networks in the same Tab. From this you can even achieve the scheduling.

    If you want your Plan cost to be appended while Project planning, check the SPRO >OPUV settings.

    regards,

    Venkatesan Anandan

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Srinivas Narayana

      Hi Srini & All,

      Thanks . As per your reply what i understood is

      To maintain a separate order type as PM06 ie Investment order

      For this one Def cost obj as WBS or FXA

      Valid receiver WBS & FXA as optional

      If i'm wrong pls correct me.

      Pls clarify these points

      1. For which scenario i've to create an Investment order in PM in daytoday plant activites

      2. In IW31 Goto---- Assignments --Investment pgms(what it indicates)

      Waiting for replies.

  • avatar image
    Former Member
    Apr 27, 2009 at 05:50 AM

    Hi

    One of the important Integration is linking your WBS (PS ) into your PM work order

    1) The idea behind this integration is you can achieve the PM work order capablities like

    Scheduling ,assigning Internal resource to your project job ,Stock material consumption ,Non stock material Procurement ,Service procurement with or with out Framework order

    2) All you need to do you in that specfic PM work order maintain the WBS as account assignment in location tab of the PM work order

    3) The cost incurred in PM work order need to be settled into the WBS

    4) The relevant config is as regular & apllicable with PM & PS like enabling the WBS as settlement reciever in Your settlement profile etc

    5) Atlast it's still posible to achieve most of the PM capablities with in PS itself ,but lot of organisation go for this route as their Interfaces & Scheduling capablities are enhanced in PM work order only .So they can use the same for PS reqirements as well

    Regards

    Satish

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 27, 2009 at 05:58 AM

    Hi

    Check out this Post

    [PM-PS|integratin-between-pmficops-and-pp]

    It might be helpful for some extent

    - Pithan