Skip to Content
0
Former Member
Apr 27, 2009 at 05:21 AM

sub contracting cost

17 Views

Hi All

I want to know how to capture subcontracting cost in Product cost / Sale order costing.

example, Material A process 1 is processed within in the company and process 2 is send outside to process further and process 3 of the same material is process inside the company.

Now how to capture process 2 cost which is process outside the Company.

2. Also incase there 2 materials in the BoM and 1st material is processed inside the company and 2nd material is processed outside the company now how to capture the sub contracting cost

Aravind