Where can I find the documents for disassembly process?

Dear all,

I have a problem now. There's a finished product A. Materials B and C are its components. Now material A needs to be disassemblyed into B and C. B can be reused, but C will be scrapped.

Where can I find the detail documents for disassembly process?

Thank you.

Paul

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 26, 2009 at 04:36 PM

    Paul,

    From your explaination, I think you need to map your disassembly process with the help of production order scenario.

    Create order for material B. Component for that would be material A. No need to maintain material C as it is already consumed for material A.

    Let me explain me in details.

    You have cretaed order for A, you have done goods issue of B & C on the same order. You have done GR for A on the same order.

    The costing you have achieved on the order.

    Now for some reason you need to disassemble the A.

    You create order for B, issue the A to this order. Not to take inot consideration the C as it is already consumed on A.

    In SAP scrap does not carry any cost. Still you want to take into account the scarp then either do the GR with movement type 531 with any of the code.

    But before that some of the things you need to take into consideration.

    1. Material type of B has to be semifinished, to eanble the creation of order against that.

    2. Create the special order type for disassembly process.

    3. Maintian the special BOM usage if B has one primary BOM in the system or else you need to edit the component overview everytime you create the disassembly order.

    Refer the link of mine to have the clear idea.

    two-boms-for-a-single-material

    Hope this helps you.

    SmanS

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 27, 2009 at 05:24 PM

    Hi paul,

    If you maintain the BOM of B with A as component & C as by product ............then when you create a order of B and do GR for the same B will be generated in stock along with C (as it is marked as by-product). GI for A will be done and it will loose its existence with confimation of the order ..........

    The area where I am not very sure is the costing front in this case ..............I will request if any FI consultant advice on the same

    Regards

    Kaushik

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.