Machine and labor time

707 Views

Hi all,

I have maintained machine and labor time in standard value key of work centre.this work centre is used in my routing. I have maintained planned timings as 10 minutes as machine timing and 20 minutes as labor timing.

After scheduling my production , I can see machine start time as 7.00 to 7.10 and then labor timing start as 7.10 to 7.30.so total it is taking 30 minutes.

But my requirement is, total it should take only 20 min, from 7.00 to 7.10, machine would be running for 10 minutes and simultaneously labor would also have done 10 minutes of work, so 7.10 to 7.20 work will get over.

In work centre ,I have used, SAP006 and SAP007 in capacity tab and SAP002 and SAP003 in scheduling tab

Please suggest , what needs to be changed in customizing.

Regards.