Skip to Content
0
Former Member
Apr 25, 2009 at 01:05 PM

update RG23 A part 1 by J1I5

26 Views

Dear Gurus,

I am issuing raw materials against production order by MB1A( 261 movt type). I have sufficient stock in storage location. Then I receipt material by MB31 (101 movt type) .When I update RG23 A Part1 by J1I5 ( IIM Classification) , system shows all the entries against 261 movement type and material document number. But when I select any one material ( line item for the document number in J1I5) it shows red traffic light and Rg23 A part is not getting updated. I have checked configuration in SPRO > IMG > LOGISTIC-GENERAL > TAX ON GOODS MOVEMENTS > INDIA > BUSINESS TRANSACTIONS > INCOMING EXCISE INVOICE > DEFINE PROCESSING MODE PER TRANSACTION And Define reference docs per transction and Specify which movement types involve excise invoices. Things are ok as far as configuration is considered.

Why system shows red traffic light in J1I5 for IIM classification? For the above scenarios what other classification is required to be selected ?

Thanx in advance.

Regards

Nilesh