Is there a way to schedule a process chain to run every 2 hours within a certain time contraint?

For example:

A process chain needs to run at 8am, 10am, 12pm, 2pm, 4pm and 6pm everyday so the time contraint would be nothing earlier than 8am and nothing later than 6pm.

I should be able to submit the process chain 6 different times as periodic jobs for each of the times needed but, if there was a need to change the times I would have to change 6 jobs.

Thank you