QM - SUB STANDARD PRODUCTS APPROVAL

59 Views

Dear friends

Consider a scenario where a raw material has a target value of 50, Lower spec limit of 40 & upper spec limit 60. Now if the results observed are 40 or 60 ( very deviating from the target value) then the semi finished goods produced will be substandard only. or if the results are slightly out of spec like values 37 or 63, then the resulting semi finished product may be of a third quality product. In such cases how to control the sub standard raw materials through SAP. For ex. shall the UD codes be given as approved with deviation and the stock be posted to reserved stock (which can be meant to be used in products where there will be a slight compromise in quality like second or third quality products). Kindly guide me with other possible solutions with respect to possible UD Codes, other possible stock postings or other possibilities.

Thanks

Selva