Skip to Content
0
Former Member
Apr 24, 2009 at 02:34 PM

Storage Location MRP

172 Views

I tried to use storage location MRP at MRP4 area in material master, so that I could calculate my resources based on each storage locations.

However, the system calculates the purchasing request (MRP) based on the reorder point data I entered at MRP1, but not the storage location based MRP reorder point at MRP4, therefore it does not generate enough puchasing request for all storage locations.

How could I provide the system to calculate the MRP purchasing requests at a total of all reorder points of each storage location?

Thanks

Irem Soydan