Hi,
I have one asset 1234. for that Already we closed the year 2008.
In the Asset master we are using Cost Center -- ABCD, but from 2009.04.01 m i want to change the Cost Center -- XYZ. For that i tried to change the cost center in following way;
1. In AS02-- Time independent data-- i enter the new interval effective from 2009.04.01 then i was saving the asset master,
But while saving one error Msg is coming
"Automatic Transfer is not Possible for Asset 1234. "
Please tell me whats the reason that why this msg is coming.
How can i change the Cost center in Asset Master.
Sachin