The business requirement on MRP area is as below
Business Objective:
Plant 4104 should have 3 storage locations 0002 (DRAWBACK) ; 0003 (NO DRAWBACK) and 0004 (INDUS)
Need to define 2 MRP Areas u2018DRAWBACKu2019 and u2018NODRAWBACKu2019 and Plant become u2018plant MRP Areau2019 (4104) by default.
When MRP run on MRP Area DRAWBACK it should consider the stocks from storage locations 0002 and 0004 &
When MRP run on MRP Area NODRAWBACK it should consider the stocks from storage locations 0003 and 0004
Issue:
Standard SAP do not allow to assign one storage location to 2 MRP areas
However is there a way to have the below assignment to achieve the business requirement.
Storage location 0002 and 0004 should be assigned to MRP Area DRAWBACK
Storage locations 0003 and 0004 should be assigned to MRP Area NODRAWBACK.
Can some one help on the details mentioned on Issue in above