i am looking a solution for re-scheduling a project:

i am creating a project with multipal WBS Network & Activitys along with duration and work (forward Scheduling) i scheduled it and sved it. Now i changed the duration in the second level WBS's activity, i re-scheduled it system is only re-scheduling for that perticulat WBS activity. System is showing the float for the other activity insteed of change in dates.

My requirement is to re schedule the whole project if change in any of the WBS activity.

Kindky suggest me waht to do ?