Hi,
in ME21N, ME22N or ME23N transaction i use the Document overview, for the item 'my Purchase order' by default the selection period is determinated to 1 week, can i extended this period to 1 month (for example) ? if yes how can i do this ?
Thanks a lot.
Cheers