Could anybody help me to solve this problem, please??
Hi everybody,
i've a problem in production order costs analysis.
in Go to-Cost Analysis for planned/actual costs I've the following situation:
4060108 R.M. ACQUISITION ACTUAL 100
8504002 R.M. CONSUMPTION PLANNED 90
This means the raw material (that should have direct procurement) is considered following the right way in actual costs (i've the right association with primary cost element 4060108. and this is due to the T030 association), but as for planned costs it considers the material has a stock, and so associates the amount to a different primary cost element (not a fiscal one). this is wrong... i would like to have also the planned cost associated to 4060108 so to have planned costs and actual on the same line.
what's the problem about? how should I solve it?? thanks very much for your help in advance!!!
chiara
Edited by: crazzauti on Apr 23, 2009 2:38 PM
Edited by: crazzauti on Apr 23, 2009 2:39 PM
Edited by: crazzauti on Apr 24, 2009 12:10 PM