Hi All.
Recently basis team has implemented the track for ESS/MSS application.So When we import the track to NWDS its showing 500 Dcs.
I have successfully done the Sync and create project operation from DTR for 150 DCS and its take 5 min per Dcs.
However after that when i am trying to sync Dc or create project DC from DTR the operation is taking more than 3 hour per DC.Which should not be the case because for rest 150 DC that i ahve done Sync operation adn Create project operation from DTR it hardly takes 5 min per Dc.As this operataion is taking so much time finally i have close the NWDS to stop this operation.
I am using NWDS 2.0.15 and EP7.0 portal SP15 and NWDI is 7.0
Can any body tell how to solve this issue so that i can Sync and Create project from DTR for a DC within 5 min?
Thanks
Susmita