Hi
We are maintaining std cost in the material master
Tool cost is maintaining in the info record as a manual condition
While running the std cost this toll cost is also added in the std cost
But this is not suppose to be add in the std cost
At the same time I have to maintain the toll cost in the info record for auto PO
How to control this