Apr 22, 2009 at 05:57 AM

Forecast based planning

643 Views

Hello all,

I am trying to implement the forecast based planning, I have configured the required setting and historical data required to forecast.

Now I am running the MRP for the material, MRP type is defined as PD (material requirement planning) and the lot size as EX (lot for lot order quantity). For example the forecast for the period is generated as 384 PCS for my material, but after MRP run it is generating the PR for 284 PCS only. Even though my stocks are ZERO.

Can any one guide me on above said issue?

Thanks in advance,

Ganesh