Hi
We are maintaining std cost in the material master
Tool cost is maintaining in the info record as a manual condition
While running the std cost this toll cost is also added in the std cost
But this is not suppose to be add
At the same time I have to maintain the toll cost in the info record for auto PO
How to control this, plz give the solution