Skip to Content
0
Former Member
Apr 22, 2009 at 05:04 AM

std cost

36 Views

Hi

We are maintaining std cost in the material master

Tool cost is maintaining in the info record as a manual condition

While running the std cost this toll cost is also added in the std cost

But this is not suppose to be add

At the same time I have to maintain the toll cost in the info record for auto PO

How to control this, plz give the solution