Apr 21, 2009 at 04:13 PM

APO Planned order changing date in APO

64 Views

Hi Gurus,

I am having a problem with planned order generated by the SNP optimizer. Every time APO generate a planned order it is being created for the first day in the bucket.

When this planned order goes to ECC it goes with the Base date correct (ECC = APO). The fields Production date in ECC are blank. The base date in ECC is the first day in the bucket

It seems that every night the fields production date gets populated, with an earlier date, and this earlier date goes back to APO, so in APO the planned order stay with the production date of ECC and not the base date suggested by the optimizer.

With this date change in APO, the planned order change from the original bucket and goes to the previously bucket.

My doubt is why in ECC the production end date is different from the base end date suggested by APO?

thanks and regards,

Luiz Manssur