Error in GR for a Production Order for a particular material....Unique case

44 Views

Hi Dear Gurus,

I am facing the following problem:

There is a production order for a material (say X, matrl type FERT) of order qty 21EA. First we did GR of qty 9EA. but when we are going to do GR for the rest of the qty i.e.12EA it is not happening system showing Error message " Account XXXXX requires an assignment to a CO object".

But while we are going to do GR for the rest 12Ea qty in two parts i.e. first by doing GR of 11EA then 1EA system is accepting.

Interestingly if do the GR for the same order as first by 8EA and then the rest 13EA that is also accepting.

Eventhough, for any other material (of same type and group) if we make a production order of the same 21EA and then doing GR firstly by 9Ea and then 12EA that is also getting posted properly.

What would be the reason for the error message for that particular case?

Here the system is SAP4.5B version, material MRP type is M0, lot size FX & fixed lot size 10Ea, safety stock 8EA, Reorder point 15.