Hi,
MRP1 view: Plant level
My MRP type is Manual reord.point w. ext.reqs (V1).
ROP=50
Lot size =Replenish to maximum stock level
Maximum stock level=80
MRP4 view: Sloc level
SLoc MRP indicator=2(Storage location stock planned separately)
Reorder point=10
Replenishment qty=60
While runniing MRP in MD03
Reqd qty Avail Qty
Stock 0
MtlRes 0000000054/0000 01 60- 60-
PurRqs 0010000045/00000 01 110 50
SLoc St 0052 StLoc: plnd sep 0 0
TrnRes 0000000054/0000 01 60 60
Now my question is when Preq is created for 110, whic will make our stock to ROL i.e. 50.
Then what is the use of Maximum stock level=80.
Pl explain
uts