Skip to Content
0
Former Member
Apr 21, 2009 at 09:23 AM

Issue For Production

21 Views

Hi Experts,

how can i issue material through Issue For Production for previous date ?

e.g I have a production order dated of 04/04/09 now i have to issue the raw material for this PO , but when i choose the posting date in Issue For Production as 04/04/09 it gives error "There is a document of this type with a later posting date"

I have to isuue material only on 04/04/09

How can i resolve this problem?

Regards