Hi Experts,
how can i issue material through Issue For Production for previous date ?
e.g I have a production order dated of 04/04/09 now i have to issue the raw material for this PO , but when i choose the posting date in Issue For Production as 04/04/09 it gives error "There is a document of this type with a later posting date"
I have to isuue material only on 04/04/09
How can i resolve this problem?
Regards