Hi,
What are the working and config steps for Changing the BOM through ECM concept?
Below is my requirement:
My requirement is when there is a new component development or new part development then first I should make the engineering BOM and during development the changes occured should be recorded through ECM and as the development gets finished then only production BOM should be made.
So If I use the BOM usage as "2" for engineering then how the ECM will help me to work for changing the BOM and to move the engineering BOM to production BOM.?
can you explain me with an example.?
Regards
Deepak Sharma