cancel
Showing results for 
Search instead for 
Did you mean: 

Source Inspection -GR for Rejection

Former Member
0 Kudos

Hi Gajesh,

I tried the scenario But at the time of GR Lot is not creatd

The setting as foolows

Control key contain- Source rejection-Create new inspction lot

In QI02 I maintained Inspection type 0101 for source Inspection & Tick is active for source insption no GR (if I Dectivate tick system will reg create lot for GR for 01 (*I maintain 01 & 0101 in material master in which 0101 is preferrred)

Please explain

Regards

Adi

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member186399
Active Contributor
0 Kudos

Dear Aditya

Vinay is absolutely right. remove the tick and then check

Regards

gajesh

Former Member
0 Kudos

Hi adi,

As per your statement Tick is active for source insption no GR , in that case lot will not create at the time of GR.

If you want lot to be created at the time of GR then you have to remove the above tick as well as in inspection control tab you have to maintain inspection active status then only lot will generate

Thanks

Vinay