Skip to Content
0
Former Member
Apr 20, 2009 at 03:54 PM

Confirmation

22 Views

Is it possible to prevent the user from manually confirming the last operation of a Production Order if there are still other non-confirmed operations within the Production Order.

In OPK4 there is a check

Is there any other method