on 07-31-2018 7:19 AM
Dear PP Gurus,
I am trying to create the SAP ECC integration between ECC and SAP ME.I want to pass the process order data to SAP ME using IDOC.
I am told by one consultant that i need to make DRF config for this.He said : Once you setup the DRF (mapping IDOC type is part of the DRF setting) and listener is configured. Then, System data will be in sync.
Plz suggest how to make this config in SAP ECC and RFC changes corresponding to this in ECC / ABAP ?