Which control key use for Backflush in master recipe ?

I want to auto GI (261) of SFG while doing confirmation of Phase.

Please guide me which control key need to use in master receipe and configuration.

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • Best Answer
    Jul 31, 2018 at 04:47 AM

    Hi Rajan,

    Control key used to do the Auto GR. If you want to do back-flush (Auto GI) while doing the confirmation, below are the master data, which will control on it.

    Material master - MRP2 Screen,Work center, Routing/ Recipe and production order/Process order.

    You can maintain the settings at least any one of the master data.

    Best Regards,

    Kumar Semmalai

    Add comment
    10|10000 characters needed characters exceeded

    • Why are you doing GI from MB1A?

      Purpose of backflush is that system will automatically do GI once you CONFIRM that operation.

      Try confirming phase in which material components are assigned from COR6N and go to Goods Movement tab. you should see your components there.

  • Jul 31, 2018 at 10:09 AM

    Hi,

    You can use any Control key (PI01 or custom) with Auto good receipt indicator checked or you can check this indicator in production sched profile and assign that in work scheduling view.

    Next, if you want some of the components as BF, then ill recommend setting it in MRP2 view. Else you can set it in Master recipe as well when allocating components to phases.

    Or, If you want all components to get consumed during confirmation then check field "goods movement" in OPK4.