I have installed a new BI system. And completed the patching for JAVA Stack. Now i started with ABAP and in need to install some add-on as well.
My deployment has been stopped with below error.
SQL error 121 occured: TCP Provider: The semaphore timeout period has expired.Communication link failure
Here is the complete error from sapmnt\trans\log\SAPIIBIII1.<SID> file
[dev trc ,00000] ParamStmtExec: line 13472. hr: 0x80004005 Communication link failure
4 ETW000 175 425.786448
4 ETW000 [dev trc ,00000] sloledb.cpp [ParamStmtExec,line 13472]: Error/Message: (err 121, sev 0), Communication link failure
4 ETW000 70 425.786518
4 ETW000 [dev trc ,00000] Procname: [##Y4GOLITSAPqbg00000042840000177083154655]
4 ETW000 30 425.786548
4 ETW000 [dev trc ,00000] sloledb.cpp [ParamStmtExec,line 13472]: Error/Message: (err 121, sev 0), TCP Provider: The semaphore timeout period has expired.
4 ETW000 120 425.786668
4 ETW000 [dev trc ,00000] Procname: [##Y4GOLITSAPqbg00000042840000177083154655]
4 ETW000 29 425.786697
4 ETW000 [dev trc ,00000] dbdsmss: DBSL99 SQL121 49 425.786746
4 ETW000 [dev trc ,00000] TCP Provider: The semaphore timeout period has expired.Communication link failure
4 ETW000 33 425.786779
4 ETW000 [dbds ,00798] ***LOG BY2=>sql error 121 performing EXE [dbds#1 @ 798]
4 ETW000 28291 425.815070
4 ETW000 [dbds ,00798] ***LOG BY0=>TCP Provider: The semaphore timeout period has expired.Communication link failure [dbds#1 @ 798]
4 ETW000 35 425.815105
1AETW000 SQL error 121 occured: TCP Provider: The semaphore timeout period has expired.Communication link failure
2EETW000 Please contact the SAP support.
4 ETW000 [dev trc ,00000] RollbackTx: line 7599. hr: 0x8000ffff Unable to open a logical session
4 ETW000 17231 425.832336
4 ETW000 [dev trc ,00000] sloledb.cpp [RollbackTx,line 7599]: Error/Message: (err -1, sev 0), Unable to open a logical session
4 ETW000 49 425.832385
4 ETW000 [dev trc ,00000] Procname: [ROLLBACK] 17 425.832402
4 ETW000 [dev trc ,00000] sloledb.cpp [RollbackTx,line 7599]: Error/Message: (err -1, sev 0), SMux Provider: Physical connection is not usable [xFFFFFFFF].
4 ETW000 104 425.832506
4 ETW000 [dev trc ,00000] Procname: [ROLLBACK] 17 425.832523
4 ETW000 [dev trc ,00000] Rollback Work (8) 25 425.832548
4 ETW000 [dbcon ,02947] ***LOG BZY=>unexpected return code 8 calling DbSlRollba [dbcon#7 @ 2947]
4 ETW000 9269 425.841817
4 ETW000 [dbcon ,02950] ***LOG BYJ=>database function ROLLBACK for connection R/3 failed [dbcon#7 @ 2950]
4 ETW000 36 425.841853
4 ETW000 [dbcon.c ,00000] *** ERROR => DISTRIBUTED_TA_FAILED: 35 425.841888
4 ETW000 [dev trc ,00000] 0: name = R/3, con_id = 000000000 state = ACTIVE , perm = YES, reco = NO , timeout = 000, con_max = 255, con_opt = 255, occ = NO
4 ETW000 38 425.841926
3WETW000 ROLLBACK failed (15951307).
4 ETW000 End of Transport (0016).
4 ETW000 date&time: 14.04.2009 - 15:54:01
4 ETW000 1 warning occured.
4 ETW000 2 errors occured.
1 ETP154 MAIN IMPORT
1 ETP110 end date and time : "20090414155401"
1 ETP111 exit code : "16"
1 ETP199 ######################################
Can somebody help me..please
Regards
Jose