on 04-15-2009 5:31 AM
hi,
I am using MC50 trx to find out the dead stocks in a plant from 15.01.2004 to 15.01.2009.the system list out the materials that are not used for the past 5 years.
Now iam taking some material code from the list which i have obtained from MC50 and checking it in mb51 trx to ensure that no movements happened in the mentioned dates as above.
but the system is showing the material mov 101,601,261,201 ..why it is so ,in what logic the system is considering the dead stocks in plant.
Regards,
velu
I
not answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Check the dates of material document in MB51. It might be previous dates.
Regards,
Raman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
any body faced the same issue.
Regards,
velu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.