Skip to Content
0
Former Member
Apr 14, 2009 at 01:41 PM

How to Check Cost Center to Manager

258 Views

Hello All,

Is there any FM to check if a cost center is involved A250 relationship with any position. The input parameter should be the costcenter and the outparam should be the position with which it has the A250 relationship.

Thanks in Advance

RK