Hi Experts,
We have Material maintained at MRP areas in R/3. Integration model is maintained with CIF object : [MRP Area Matl, MRP Areas] to bring the new material master at MRP Area changes through Delta mode(CFM3), but the changes to existing material in Integration model at MRP Area does not come over immediately to APO and not through DELTA mode.
We have to execute Report: RIMODINI to bring the changes of existing material master changes at MRP Area level to APO. Since its a performance intensive it takes too long to execute to bring changes over to APO.
Is there alternative method of bringing the existing material master changes at MRP area level for CIF object : [MRP Area Matl, MRP Areas] to APO without executing RIMODINI.
Additional Information: R/3: SAP_APPL 470 0030 SAPKH47030
R/3: PI 2004_1_470 0015 SAPKIPZI5F
APO:SCM 500 0012 SAPKY50012
Thanks,
K Sendil Kumar
Thanks,
K sendil Kumar