on 04-13-2009 9:08 AM
Dear PP Gurus
Currently we have a new requirement from our client,
The scenario is as follows:
Add functionality to the availability check that will enable it to consider
material batches that expire before the planned/process order finish date
to be excluded as available for those orders.
For Example: Material ABC has batch 123 with an expiration of 31-May-2009
(5 each on hand) and batch 456 with an expiration of 31-July-2009 (3
each on hand). Order number 200xxxx is scheduled to finish on
05-June-2009 and has material ABC on its material list for a quantity
of 5 each. When material availability for order 200xxxx is checked,
we would like for the system to indicate that there is a material
shortage of 2 each. In this situation, this is because batch 123
will expire before the 05-June-2009 finish date and batch 456 does
not have a sufficient quantity (3 each) to meet the full requirement
of 5 each for order 200xxxx.
I request you to let me know if there is any SAP OSS message that can be applied which can fulfill the requirement or if there is any user exit / enhancement that can be considered for this?
Is there any other option available to cover this scenario.
Thanks & Regards,
Harleen Kaur
Application Consultant-PP
The material expiration date is not taken into account during material availabilty check. For this functionality, user exit is used to exclude the expired batches during availability check.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Refer OSS563863...
Hope it will help...
karthick
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.