Skip to Content
0
Former Member
Apr 09, 2009 at 05:02 PM

Locking problem in VL02N at the time Post Goods issue

195 Views

Hi,

We have implemented 2 BADIs to change qty in delivery and in subsequent documents. Once we receive an IDoc with batches, then we need to change subitems qty according to no of batches.

Once IDoc has updated, then PGI will do automatically.

1. LE_SHP_DELIVERY_PROC - Change qty in delivery (Method SAVE_DOCUMENT_PREPARE)

2. LE_SHP_GOODSMOVEMENT - Change qty in material document.

Now, we have a locking problem at the time of posting.

Please let us know, due to these BADI implementation this problem or any other cause? And provide required to solve this problem.