Hi,

Can we do a StockTransfer Order from one store room to another store room in the same plant?what would be the transaction and the movement type?

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

So you mean to say directly go to MB1b and with Mvt ty 311 do the stock transfer.

BUt for interplant STO we create PR and PO so i believe we will have to do it here as well.

PLease correct me if i am wrong.

vijay_singh21
Contributor
0 Kudos

There is no need to do a PO for this. This is just a transfer posting from storage location to storage location. Po is usually created when you have to send an external instruction for a vendor( or plant) to send a material. It is not required in your case.

Hope it helps.

former_member182609
Active Contributor
0 Kudos

So you mean to say directly go to MB1b and with Mvt ty 311 do the stock transfer.

Yes you are correct

BUt for interplant STO we create PR and PO so i believe we will have to do it here as well.

this not possible.

vijay_singh21
Contributor
0 Kudos

Hi sridhar,

You can not make a PO from one stor loc to another.

former_member182609
Active Contributor
0 Kudos

we can make PO ECC 5 sto between storage location to storage location with in a plant.

in 4.7 it is not possible

vijay_singh21
Contributor
0 Kudos

you are right..

Sorry, i thought you had posted the question:-)

Answers (5)

Answers (5)

former_member197616
Active Contributor
0 Kudos

Hi,

The requirement of yours can be dealt in two ways.

1.Direct transfer from one storage location to other using one step.

At MIGO transaction ---Transfer posting and moment type 311 and provide other details and transfer .

2.Two step procedure.

Using the moment type 313---remove the stock from storage.

Using the moment type 315 place the stock in the required storage.

Regards,

Former Member
0 Kudos

So, the steps would be...

1. create a requisition

2. APprove requisition.

3 Create PO

4. MB1b transaction with mvt type 311 the donating store room posts the material.

Please let me know if i am correct.

Thanks

vijay_singh21
Contributor
0 Kudos

no need of requistion. Just a transfer posting using MB1B is required.

Why do you want to create PR>>PO?

Edited by: Vijay Singh on Apr 1, 2009 1:21 PM

Former Member
0 Kudos

Hi

Add one more step also

1. create a requisition

2. APprove requisition.

3 Create PO

4. MB1b transaction with mvt type 311 the donating store room posts the material.

5. In MIGO for 101 movement type receive goods.

Regards,

Raman

Former Member
0 Kudos

Hi ,

I am using 4.7 SAP version. I could not find the last step "stock transfer between storage location".

Do, you want us to configure that or will that be available already?

If we can do the STO by 2 step movement type then how exactly i need to proceed?

Thanks

former_member182609
Active Contributor
0 Kudos

In 4.7 this option is not avilable

you have to transfer through material posting MB1B with mvt type 311.

Former Member
0 Kudos

Hi

Please have look at the OSS note numbers - 598799,608560.

Otherwise as suggested by freinds above you can use Tcode MB1B and use (mvt type 313 +315 for two step) and 311 for one step.

regards

Yogesh

former_member182609
Active Contributor
0 Kudos

If my understanding correct are you asking you want to create STO between two storage locations with in a plant ?

if yes it is possibe

for this you need to set up configuration in SPRO

Transaction OLME>Purchase Order>Set up Stock Transport Order-->Set Up Stock Transfer Between Storage Locations

Former Member
0 Kudos

Hi,

As per standard SAP, you cant create the STO within the plant....

But you can transfer the item with two step movement type...

Regards

anand